by Hydrostor Admin | Feb 8, 2025 | Featured Coverage
As Australia shifts to 100% renewable energy, long-duration storage solutions are vital for managing the imbalance between excess solar and wind energy during low demand and shortages during peak demand times. Hydrostor’s Silver City Energy Project in Broken Hill uses...
by Hydrostor Admin | Jan 25, 2025 | Featured Coverage
Britain came close to a blackout this month. Gas is being phased out and renewables are intermittent, so can energy storage stop us going dark? Read more
by Hydrostor Admin | Jan 24, 2025 | Insights
Long Duration Energy Storage (LDES) is finally getting the global attention it deserves, both as the grid stability solution for variable power and as an essential part of the reliable, resilient grid needed for future economic growth. Yet, despite massive innovation...
by Hydrostor Admin | Jan 13, 2025 | Featured Coverage
The Biden administration has offered a $1.76 billion conditional loan guarantee to Hydrostor’s Willow Rock advanced compressed-air energy storage project in California, which aims to store energy using compressed air in underground caverns. Hydrostor’s A-CAES...
by Hydrostor Admin | Jan 8, 2025 | Insights, Press Release
DENVER, COLORADO, 8 JANUARY 2025 – Long-duration energy storage developer and operator, Hydrostor, has reached a conditional commitment for a loan guarantee of up to $1.76 billion with the U.S. Department of Energy’s (DOE) Clean Energy Financing Program...